Blue post-tensioning tendons and steel reinforcement laid across a large slab deck, with workers behind
Apartments · Basements · Podiums · Warehouses

Post-tensioned slabs in Melbourne, built for long spans.

Post-tensioned slabs for apartments, basements, podium decks and warehouse floors across Melbourne. Steel tendons are stressed once the concrete sets, giving thinner slabs, longer spans and fewer columns.

Get your free PT slab quote

A few quick questions. We call back within one business day.

No obligation. We never share your details.

Where does a PT slab fit your build?

Post-tensioning earns its place where spans get long and loads get heavy: open-plan apartments, basement car parks, podium decks and warehouse floors. Pick the closest match, or send the engineer's drawings and we will tell you.

Two workers in hi-vis standing on a slab deck covered in steel reinforcing bars

Apartment floors

Long, open spans with fewer columns, so floor plans stay flexible and slabs stay thinner.

Best for: multi-storey apartment blocksQuote an apartment slab →
Post-tensioning cables and steel reinforcement laid across a large slab, ready for the concrete pour

Basements and car parks

High load capacity for basement and car park floors, with few columns in the way of cars.

Best for: basements, underground parkingQuote a basement PT slab →
White post-tensioning ducts and reinforcement across a large slab deck, with a tower crane and workers behind

Podium and roof decks

Suspended slabs over car parks and shops, and roof slabs that need few support columns.

Best for: podiums, mixed-use buildingsQuote a podium deck →
Reinforcement and cables laid across a slab inside a large shed, with a concrete pump truck and mixer behind

Warehouse floors

Heavy-load floors for machinery and storage, with tendons that resist shrinkage cracks.

Best for: warehouses, industrial unitsQuote a warehouse slab →

From drawings to a stressed slab in four steps

Start with step 1
STEP 1

Send your drawings

Send the engineer's PT drawings and plans, or just tell us the suburb and the job. No drawings yet? We can still give a budget range.

Takes 2 minutes
STEP 2

Site visit and fixed quote

We check access, levels and formwork on site, then send a written quote listing formwork, tendons, steel and concrete line by line.

Within 1 business day of the visit
STEP 3

Lay, pour and stress

Formwork, tendons and steel laid to the drawings and checked, then the pour. Tendons are stressed once the concrete is strong enough.

Pour and stressing dates in your quote
STEP 4

Handover and records

Tendons anchored, site cleaned, and concrete dockets and stressing records handed over so the next trades can start.

Next-trade date after stressing

Got your PT drawings? Send them over and we'll take it from there.

You'll have a clear, itemised quote back within one business day, with no surprises later.

Why builders call Urban Pour for PT slabs

A post-tensioned slab only works if every tendon sits where the engineer drew it. We lay, pour and stress to the drawings, then hand over the records.

Post-tensioning anchors and coiled steel strands set among reinforcing bars before a slab pour

Less concrete, less steel

PT slabs need less concrete and reinforcement than a conventional slab, and less formwork, which saves time and cost.

Longer spans, fewer columns

Tensioned tendons carry the load across wider spans, so you get open floor plans without extra support columns.

Resists shrinkage cracking

Stressed tendons hold the slab in compression, which limits shrinkage cracks and keeps maintenance low over its life.

Built to AS 3600

Concrete, cover, stressing and inspections done to AS 3600, with dockets and stressing records handed over at the end.

Questions people ask before they book a PT slab

Straight answers. If yours is not here, call and ask.

Call 0433 189 316 →
How much does a post-tensioned slab cost in Melbourne?

The price of a PT slab depends on span, slab thickness, loads, access and height. Send the engineer's drawings and you get a fixed figure, not a guess.

Is a PT slab cheaper than a conventional reinforced slab?

Often, on longer spans. PT slabs use less concrete, steel and formwork, and go up faster. On short spans a conventional slab can still win. We can price both from your drawings.

When are the tendons stressed?

Once the concrete reaches the strength the engineer specifies. Formwork and props stay in place until stressing is done and checked, and we give you a clear date.

Do you handle the formwork and steel too?

Yes. Formwork, ducts, tendons, reinforcement, the pour and stressing all sit under one quote, so you deal with one contact for the whole slab.

Which areas of Melbourne do you cover?

We are based in Preston and pour across the northern, eastern, western and south-eastern suburbs and the inner city.

Ready to pour? Get your PT slab priced this week.

A few questions, one callback, one free quote. Urban Pour pours PT slabs for apartments, basements and warehouses across Melbourne.