Yellow piling rig drilling with a long auger on a residential site, steel reinforcement cages in front
Bored piers · Pier walls · Warehouses · Benching

Piling and bored piers in Melbourne, built to stay put.

Bored piers and piling for homes, townhouses, basements and warehouses on weak, loose or sloping ground across Melbourne. We bench the site, drill the piers, place the steel and pour, installed to AS 2159.

Get your free piling quote

A few quick questions. We call back within one business day.

No obligation. We never share your details.

Which piers does your site need?

Soil and load decide the foundation. Weak or loose ground, sloping blocks and heavy warehouse floors all need support from deeper, stable layers. Pick the job you have, or send the soil report and drawings and we will tell you.

Clay-coated auger drill bit lying beside a steel reinforcement cage on a piling site

Bored piers for homes

Reinforced concrete piers for homes and apartments where surface soil can't carry the load.

Best for: new homes, townhouses, apartmentsQuote bored piers →
Row of exposed bored concrete piles forming a retaining wall beside a building site

Pier retaining walls

Rows of piers that hold back the ground around basements and deep cuts on sloping sites.

Best for: basements, sloping blocksQuote a pier wall →
Tracked piling rig with a tall auger mast drilling on a worksite, a worker standing at its base

Warehouse piling

Heavy-duty piled foundations for warehouses and factories that need to carry heavy loads.

Best for: warehouses, factories, workshopsQuote warehouse piling →
Workers in hi-vis standing in a sandy excavation in front of a concrete pile retaining wall

Site benching and prep

Bulk excavation and benching on sloping or uneven ground so the piers start from a stable base.

Best for: sloping and uneven blocksQuote site benching →

From soil report to finished piers in four steps

Start with step 1
STEP 1

Send your plans

Send the engineer's drawings and soil report, or just tell us the suburb and the job. No plans yet? We can still give a budget range.

Takes 2 minutes
STEP 2

Site visit and fixed quote

We check rig access, levels and the ground on site, then send a written quote listing benching, piers, steel and concrete line by line.

Within 1 business day of the visit
STEP 3

Bench, drill and pour

Site benched, piers drilled to the engineer's depth, steel cages placed and inspected, then concrete poured to the top of each pier.

Rig dates set in your quote
STEP 4

Handover and paperwork

Pier depths and positions recorded, site cleaned, dockets and inspection records handed over so the slab or beams can follow.

Next-stage date at handover

Got your plans and soil report? Send them over and we'll do the rest.

You'll have a clear, itemised quote back within one business day, with no surprises later.

Why builders call Urban Pour for piers

Piers sit under everything else and can't be fixed once the slab is down. We bench, drill and pour to the engineer's design, so the base is right.

Worker in hi-vis and hard hat measuring beside a large drilling auger next to a piling rig

Bench, drill and pour in one job

We prepare the site, drill the piers, place the steel and pour the concrete, so one quote covers the foundation.

Matched to your soil report

Pier depth and spacing follow the engineer's design and the site's soil report, not guesswork on the day.

Less ground movement

Loads carried down to stable soil reduce the shifting, settling and cracking that weak ground can cause.

Installed to AS 2159

Piers installed to AS 2159 for piling, with depths, dockets and inspection records handed over at the end.

Questions people ask before they book piling

Straight answers. If yours is not here, call and ask.

Call 0433 189 316 →
How much do bored piers cost in Melbourne?

The price depends on pier depth, diameter, soil, rig access and the number of piers. Send the drawings and soil report and you get a fixed figure, not a guess.

Do I need bored piers or standard footings?

Your engineer decides from the soil report. Weak, loose or filled ground and heavy loads usually need piers down to stable soil. We price to whatever the drawings specify.

Do I need a soil report before you start?

Yes. A soil report from your engineer or geotechnical consultant sets the pier depth and design. We read it with the drawings and build the piers to their specification.

Can you do the site benching before piling?

Yes. Bulk excavation and site benching on sloping or uneven ground are part of the job, so the site is ready before the first pier goes in. One quote covers both.

Which areas of Melbourne do you cover?

We are based in Preston and pour across the northern, eastern, western and south-eastern suburbs and the inner city.

Ready to dig in? Get your piers priced this week.

A few questions, one callback, one free quote. Urban Pour installs bored piers and piling for homes and builders across Melbourne.